Free Dec-2024 ISO-9001-Lead-Auditor Dumps are Available for Instant Access [Q13-Q34]

Free Dec-2024 ISO-9001-Lead-Auditor Dumps are Available for Instant Access [Q13-Q34]

December 22, 2024 ISO-9001-Lead-Auditor > PECB 0
4/5 - (1 vote)

Free Dec-2024 ISO-9001-Lead-Auditor Dumps are Available for Instant Access

View All ISO-9001-Lead-Auditor Actual Exam Questions Answers and Explanations for Free

Q13. An internal auditor of a manufacturer of polystyrene packaging products for the electronics industry raised a nonconformity against section 10.3 of ISO 9001 in Report IA202. The nonconformity (NC 3) stated:
“The reject rate of ‘finished’ product of 9.7% needs improvement as it doesn’t meet the stated objective of top management of 5%.” Just before the Closing meeting of a third-party audit, the audit team leader is invited to a meeting with the Quality Manager. He tells the audit team leader that a member of the audit team was seen taking photographs of the factory on his phone during the day and wants him suspended from the Closing meeting with any nonconformities raised by him rescinded. The issue of photographs was not discussed during the opening meeting.
Select the three options for how the audit team leader might deal with this situation.

 
 
 
 
 
 

Q14. Select the term which best describes the quality management system process of modifying a non-conforming product to bring it within acceptance criteria.

 
 
 
 

Q15. During a third-party audit of a pharmaceutical organisation (CD9000) site of seven COVID-19 testing laboratories in various terminals at a major international airport, you interview the CD 9000’s General Manager (GM), who was accompanied by Jack, the legal compliance expert. Jack is acting as the guide in the absence of the Technical Manager due to him contracting COVID-19.
You: “What external and internal issues have been identified that could affect CD9000 and its quality management system?” GM: “Jack guided us on this. We identified issues like probable competition of another laboratory organisation in the airport, legal requirements on COVID-19 continuously changing, the shortage of competent laboratory analysists, the epidemic declining soon, shortage of chemicals for the analysis. It was quite a good experience.” You: “Did you document these issues?” GM: “No. Jack said that ISO 9001 does not require us to document these issues.” You: “How did you determine the risks associated with the issues and did you plan actions to address them?” GM: “I am not sure. The Technical Manager is responsible for this process. Jack may be able to answer this question in his absence.” Select two options for how you would respond to the General Manager’s suggestion:

 
 
 
 
 
 

Q16. You are conducting a third-party Stage 1 audit at ABC Ltd, a single-site organisation that manufactures wooden furniture. You interview the Technical Director to learn more about the organisation. The Technical Director explains that they have had a successful year and that obtaining ISO 9001 certification will support the further growth of the business. You ask for an overview of the organisation’s structure and its interrelationships with external interested parties.
The Technical Director shows you a document detailing all business processes and interrelationships. You notice in this document that another organisation called Teak Ltd manufactures wooden furniture on behalf of ABC Ltd. The Technical Director confirms this capability has been accounted for in the scope of the quality management system. You learn that the furniture manufactured by Teak Ltd has accounted for 40% of the sales revenue over the previous 12 months.
Which two of the following options best describe how you would plan the audit of the interrelationship with Teak Ltd during the Stage 2 audit at ABC Ltd?

 
 
 
 
 
 

Q17. Which of the following two documents does an auditor need to prepare and complete prior to the on-site audit?

 
 
 
 
 
 

Q18. Which two of the following should be included in an audit plan?

 
 
 
 
 
 

Q19. Match the process descriptions below to the process names:

Q20. Match the process descriptions below to the process names:

Q21. In the context of a management system audit, identify the sequence of a typical process for collecting and verifying information. The first one has been done for you.
To complete the sequence click on the blank section you want to complete so it is highlighted in red and then click on the applicable text from the options below. Alternatively, drag and drop the options to the appropriate blank section.

Q22. Noitol is an organisation specialising in the design and production of e-learning training materials for the insurance market. During an ISO 9001 audit of the development department, the auditor asks the Head of Development about the process used for validation of the final course design. She states that they usually ask customers to validate the product with volunteers. She says that the feedback received often leads to key improvements.
The auditor samples the design records for a recently completed course for the 247 Insurance organisation.
Design verification was carried out but there was no validation report. The Head of Development advises that this customer required the product on an urgent basis, so the validation stage was omitted. When asked, the Head estimates that this occurs about 50% of the time. She confirms that they always ask for feedback and often make changes. There is no record of feedback in the design file for the course.
The auditor decides to review the training course design process in more depth.
Select three options that provide a meaningful audit trail for this process.

 
 
 
 
 
 
 
 

Q23. Which two of the following are included in the objectives of the ‘Stage 1 initial certification audit’?

 
 
 
 
 
 

Q24. Audit criteria are a set of requirements used as a reference against which objective evidence is compared.
Which two of the following are not potential audit criteria?

 
 
 
 
 
 
 
 
 
 

Q25. Which two of the following aspects of a quality management system must the organisation continually improve?

 
 
 
 
 
 

Q26. Select six tasks you would expect to be completed at the audit team meeting of a third-party audit team leader and his audit team in preparation for a Closing meeting for a four-day initial certification audit.

 
 
 
 
 
 
 
 
 
 

Q27. Which two of the following are the key expected results of a quality management system that conforms to the requirements of ISO 9001:2015?

 
 
 
 
 
 

Q28. A Health Trust has contracted with Servitup, a catering services organisation which has been certified to ISO
9001 for 1 year. It provides services to ten, small rural
hospitals in remote locations involving purchase and storage of dry goods and fresh produce, preparing meals and loading heated trolleys for ward service by hospital staff. An auditor is conducting the first sole surveillance audit at one site with the Deputy Catering Manager (DCM).
At the closing meeting attended solely by the DCM, the auditor informs him that he has found numerous gaps in the QMS processes which lead him to consider recommending suspension of the organisation’s certification. He is particularly concerned with the evidence that patient health is being adversely affected by produce stored beyond its safe consumption date, poor kitchen hygiene and undercooked meals. The DCM says that he cannot make any decisions about these issues in the absence of the Catering Manager due to illness but will write everything down and report to the Catering Manager.
Which two actions should you take in the context of the audit?

 
 
 
 
 
 

Q29. You are conducting an audit at a single-site organisation seeking certification to ISO 9001 for the first time.
The organisation manufactures cosmetics for major retailers and the name of the retailer supplied appears on the product packaging. Sales turnover has increased significantly over the past five years You are interviewing the new Product Development Manager. You note that a software application called SWIFT is used to help control the product development process.
You have gathered audit evidence as outlined in the table. Match the ISO 9001 clause 8.3 extracts to the audit evidence.

Q30. The following are stages of an audit, put them in the order they would be conducted.

Q31. According to ISO 19011, what two activities take place during the conduct of a audit follow-up?

 
 
 
 
 
 

Q32. You work for an organisation, ‘A’, which provides packaged food to the public. You are asked to lead a team (you as the leader and two other auditors) to audit a supplier, ‘B’, which provides packaging materials to your organisation. It is 4 p.m. and the audit is close to an end; you are having an internal meeting with the team to decide what will be presented to the auditee during the Closing meeting.
The Closing meeting was scheduled
for 5 p.m.
You, as audit team leader, audited top management, the laboratory, and the storage of raw materials.
Auditor 1 audited the two manufacturing lines and dispatch areas.
You to Auditor 1: “What findings would you report?”
Auditor 1: “When reviewing the Dispatch records, I noticed that during the morning two different trucks (Number 011 and 025) delivered the same batch number of the product (Batch 33555). Truck 011 left the plant at 9.15 am and Truck 025 left the plant at
11.30 am. Procedure P-02 Rev.3 says
that trucks should carry a complete batch. The batch number, once on the truck, is captured using a QR device.” You: “OK, what do you think?” Auditor 2: “I think that this is a nonconformity.” You: “OK. How would you describe the evidence on which the nonconformity will be based”?
Identify which one of the following statements best describes the identified nonconformity.

 
 
 
 

Q33. Which two of the following statements related to Stage 1 of an initial certification audit against ISO 9001:2015 are true?

 
 
 
 
 
 
 

Q34. You have been nominated audit team leader of a third-party audit. Which of the following could be the two most relevant objectives of this audit?

 
 
 
 
 
 

The Most In-Demand ISO-9001-Lead-Auditor Pass Guaranteed Quiz : https://www.examboosts.com/PECB/ISO-9001-Lead-Auditor-practice-exam-dumps.html

         

Related Links: issuu.com www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.fundable.com

 

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below