Q176. Using UPS5000-E (50kVA power module), the actual load is 160kW, the rack 1+1 redundancy, the single-machine backup power scheme is adopted, each rack has 3 groups of batteries, each group is 30, and the capacity of the main switch box is ( )

 
 
 
 

Q177. Which of the following models can be equipped with an external high-capacity battery charger for fast recharging? ()

 
 
 
 

Q178. UPS5000-E can maintain high efficiency in a wide load range and effectively reduce losses. Among them, the efficiency can reach 96% at 40% load, and the efficiency can reach 95% at 20% load. What is the efficiency in ECO mode? ( )

 
 
 
 

Q179. Air conditioning water systems include cooling water systems, chilled water systems and condensate water systems.

 
 

Q180. In PDU8000, what are the optional functions (

 
 
 
 

Q181. Considering that the UPS system is fully configured in the early stage of construction, but the actual system load rate is low, UPS5000-E is designed with an intelligent sleep function, which can increase the system load rate and keep the system running efficiently. When the UPS5000E sleeps intelligently, at least how many power modules are redundant?

 
 
 

Q182. FusionModule1000A V2R3 version 20-foot CT solution is equipped with 4 600*800*2200mm CT cabinets

 
 

Q183. Three-proof paint coating can significantly reduce the failure rate of UPS in harsh environments such as salt spray, dust, high temperature and high humidity, and ensure its service life in harsh environments.

 
 

Q184. Different brands of battery packs with the same capacity can be used in parallel.

 
 

Q185. The fan of Huawei Precision Air Conditioner NetCol5000-C030 cannot be maintained online.

 
 

Q186. UPS5000-A-400/500K can support up to () parallel machine, with good scalability. (

 
 
 
 

Q187. FusionModule800UPS has a capacity ( ).

 
 
 
 

Q188. UPS2000-G-(6K- 20K) has a strong lightning protection design in the industry, lightning protection level (), surge protection level (), can avoid 90 failures caused by lightning strikes, and reliably protect the exchange of back-end equipment. input port.

 
 
 
 

Q189. Does the FusionModule800 channel have a skylight? (

 
 

Q190. Which of the following statements are true about the iBattery battery management system? ()

 
 
 
 

Q191. Functions that can be achieved by modular UPS: ()

 
 
 
 

Q192. When multiple FusionModule products are used in the same project, when configuring NetEco, the associated application scenario should be selected ()

 
 
 
 

Q193. FusionModule solution can use ECC800 to realize local monitoring, and use NetEco management system to realize centralized monitoring of multiple micro-modules. Then, in the project bidding quotation, which product is the configuration quotation of the ECC800 collector in?

 
 
 
 

Q194. NetEco. supports northbound integration, which of the following is not currently supported? ( ).

 
 
 
 

Q195. Regarding the selection of the outdoor unit of NetCol5000, what conditions should be considered ( ).

 
 
 
 

Q196. The FusionModule2000 integrated power distribution cabinet has two input switches of single-channel MCCB and ATS.

 
 

Q197. The UPS5000-A supports the adjustable number of battery cells, avoiding the failure of a single battery to cause the replacement of the entire group, and solving the problem of difficult maintenance of traditional UPS batteries ranging from 30 to 40 cells.

 
 

Q198. The NetEco management system supports dispatching corresponding work orders for a certain alarm to track the entire processing process. What type of work order is this? (

 
 
 
 

H19-371_V1.0 Study Material, Preparation Guide and PDF Download: https://www.examboosts.com/Huawei/H19-371_V1.0-practice-exam-dumps.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

 

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below